Brightspot CMS User Guide

Creating a schedule


You can schedule an asset for publication at a future date. You can later change the scheduled date, or schedule multiple publication dates for different versions of the asset. You can also remove the scheduled date and publish the asset immediately.

To schedule an asset for future publication:

  1. Search for and open the asset in the content edit page.
  2. In the editorial toolbar, click date_range. A calendar appears.
  3. Set the date and time at which you want the asset to go live.
  4. Click Set. The scheduled time appears with the Schedule button in the editorial toolbar.

    Schedule button shown on article.png Schedule button shown on article.png

    1. Click Schedule.

    The scheduled asset is added to the Revisions widget.

    Previous Topic
    Scheduled publishing
    Next Topic
    Updating a schedule
    Was this topic helpful?
    Thanks for your feedback.
    Our robust, flexible Design System provides hundreds of pre-built components you can use to build the presentation layer of your dreams.

    Asset types
    Module types
    Page types
    Brightspot is packaged with content types that get you up and running in a matter of days, including assets, modules and landing pages.

    Content types
    Modules
    Landing pages
    Everything you need to know when creating, managing, and administering content within Brightspot CMS.

    Dashboards
    Publishing
    Workflows
    Admin configurations
    A guide for installing, supporting, extending, modifying and administering code on the Brightspot platform.

    Field types
    Content modeling
    Rich-text elements
    Images
    A guide to configuring Brightspot's library of integrations, including pre-built options and developer-configured extensions.

    Google Analytics
    Shopify
    Apple News