Brightspot CMS User Guide

Replacing content in scheduled assets


You can replace content within a scheduled asset, thereby overwriting its existing content without having to re-schedule the asset.

Note
In order to replace content within a scheduled asset, its schedule must have a defined trigger date.

To replace content in scheduled assets:

  1. Search for and open the asset's content edit page. If the asset is scheduled, Brightspot displays scheduling options.
    Scheduling options.png Scheduling options.png
  2. Click the selection field next to visibility.
    Scheduling selection field.png Scheduling selection field.png
  3. Select Replace.
  4. Click Schedule. Any edits you make to this scheduled asset replace the existing content within the scheduled asset.
Previous Topic
Merging edits into scheduled assets
Next Topic
Bulk scheduling
Was this topic helpful?
Thanks for your feedback.
Our robust, flexible Design System provides hundreds of pre-built components you can use to build the presentation layer of your dreams.

Asset types
Module types
Page types
Brightspot is packaged with content types that get you up and running in a matter of days, including assets, modules and landing pages.

Content types
Modules
Landing pages
Everything you need to know when creating, managing, and administering content within Brightspot CMS.

Dashboards
Publishing
Workflows
Admin configurations
A guide for installing, supporting, extending, modifying and administering code on the Brightspot platform.

Field types
Content modeling
Rich-text elements
Images
A guide to configuring Brightspot's library of integrations, including pre-built options and developer-configured extensions.

Google Analytics
Shopify
Apple News